Skip to content

Leaders fear another Grenfell

Date posted
25 November 2026
Type
Press release
Author
Bella Leathley
Estimated reading time
3 minute read

Nearly a decade after the Grenfell Tower fire, more than nine in 10 UK construction industry leaders believe a tragedy on a similar scale could happen again, according to new IOSH-commissioned research.

The findings, published in IOSH’s new white paper, Safe by design, highlight concerns about accountability, competence, procurement practices and risk management across the built environment.  

The research, conducted among 250 senior construction industry leaders including chief executives, managing directors and site directors, found that: 

  • 91% believe another Grenfell-scale tragedy could happen in the UK
  • 81% believe between 10% and 50% of construction risks could have been eliminated through better design decisions before work started
  • 93% are confident their organisation has the competence needed to manage health and safety risks across the building lifecycle
  • 31% identify supply chain management and contractor competence as the sector’s biggest skills gap
  • 51% say materials, products and specifications are often or always changed primarily to reduce project costs 
  • 34% say stronger leadership accountability would have the greatest impact on improving safety outcomes.

The findings come as IOSH launches a new call for government, industry leaders and built environment professionals to adopt a lifecycle approach to safety and health, recognising that risks are shaped by decisions made long before construction begins and long after it ends. 

“The built environment shapes how we live, work and interact with the world around us. The decisions made throughout a building’s lifecycle affect not only workers, but also the people who occupy, maintain and use those spaces for decades to come. Our research shows there is growing recognition across the sector that safer outcomes depend on stronger leadership, greater competence and better decision-making from the earliest stages of a project.”

Job role
Company

The fire at Grenfell Tower in London in June 2017 killed 72 people. The inquiry which followed found a chain of failures which led to the tragedy. The Building Safety Act was introduced in 2022 and has led to improvements, but IOSH says more needs to be done. 

Shaun added: “The fact that more than nine in ten construction leaders believe another Grenfell-scale tragedy remains possible should serve as a reminder that safety can never be taken for granted. While important progress has been made since Grenfell, regulation alone cannot prevent future failures.  

“We must move beyond viewing safety as something that begins on site and ends at project completion. The greatest opportunity to prevent harm is often before construction starts, when decisions about design, procurement, competence and governance are still being made. 

“Safer and healthier buildings begin with better decisions. By embedding safety and health throughout the entire lifecycle of buildings and infrastructure, we can create better outcomes for workers, occupations and communities alike.” 

The white paper argues that health and safety should be treated as a whole-system issue spanning planning, design, procurement, construction, occupation, maintenance, refurbishment and decommissioning.  

It warns that commercial pressures continue to influence critical decisions throughout projects and calls for greater emphasis on safety in-design principles, demonstrate competence, stronger leadership accountability and better management of occupational health risks. 

The paper also highlights emerging challenges facing the sector, including climate change, extreme temperatures, skills shortages, evolving technologies and the need to improve workforce retention. 

As part of the report, IOSH is calling on governments, policy makers, businesses and industry leaders to: 

  • embed prevention through safety-in-design principles and whole-life risk management
  • strengthen competence through education, training and continuing professional development
  • improve accountability and leadership across the built environment lifecycle
  • reform procurement approaches to prioritise safety, quality and long-term value alongside cost
  • improve the collection and sharing of health and safety information
  • better support occupational health and worker wellbeing.

The report concludes that the lessons of Grenfell, alongside the challenges posed by climate change and technological change, require a new approach in which health and safety is embedded from the outset and remains central throughout the life of every asset. 

Safe by design

Discover what safety leaders believe must change at the design stage to prevent future workplace tragedies.

Last updated: 25 November 2026

Job role
Company

You may also like

  • Construction safety shortcuts risk
  • IOSH warning over building safety
  • Climate action and worker safety